Removing a load-bearing wall in Valbonne with HEA steel structure reinforcement

Engineering office construction drawing: elevation of the HEA 200 beam, the reinforced concrete padstone and the HEA 120 column for removing the load-bearing wall in Valbonne

From our Nice branch, OMPT GROUPE worked in Valbonne to remove a 20 cm thick load-bearing wall on the ground floor of a house. The wall carried a beam-and-block floor. Its demolition was therefore accompanied by a steel structure reinforcement, sized by our engineering office OMPT STRUCTURE and detailed in a construction drawing.

A steel structure designed for this project

The opening is about 3.20 m wide and 2.70 m high. The two supports of the new beam were very different:

  • on the left, a hollow concrete block wall, which was kept;
  • on the right, a light partition, unable to carry anything, and under the floor a reinforced concrete beam belonging to the garage.

Each support therefore received its own solution, defined in OMPT STRUCTURE’s construction drawings.

Propping and checks before demolition

Before any work, the floors were propped, with props resting on the garage’s concrete beam or carried down to the garage. The concrete beam was probed where the future column would stand, to check that it could take the load.

Left support: reinforced concrete padstone

In the retained wall, we cut a pocket and then cast a 20 × 20 × 60 cm reinforced concrete padstone, reinforced with 4 HA 10 bars and HA 6 links. Below the padstone, the cavities of the hollow blocks were filled with concrete over at least two courses. The load thus goes down into a solid wall rather than into hollow blocks.

Right support: HEA 120 column on plates

The second support is an HEA 120 steel column, built into the existing partition:

  • at the base, a 20 mm steel plate, fixed to the garage’s concrete beam with 4 M12 chemically anchored rods, placed between the reinforcing bars without cutting any of them;
  • at the top, a 10 mm plate bolted to the beam with 4 grade 8.8 M16 bolts.

Installing the HEA 200 beam and loading it

The S275 steel HEA 200 beam, about 3.20 m long, rests on the padstone on a bed of non-shrink mortar, and on the column via the top plate. Welded stiffeners reinforce the web at both supports.

The beam was loaded by driving wedges between the beam and the floor, while the garage beam was monitored with a laser level. The remaining gap was then packed with non-shrink mortar, and the props were removed gradually.

Protection and finishing

The steel frame received an anti-rust coating, then Placoflam-type plasterboard casing for fire resistance. The structure is thus protected and fully integrated inside the house.

A larger living area in Valbonne, in complete safety

Removing the load-bearing wall freed up a large living area on the ground floor. Study, construction drawings, phasing and works were all carried out within the OMPT group: OMPT STRUCTURE for the calculations and drawings, OMPT GROUPE for the works.

OMPT GROUPE removes and opens load-bearing walls, installs steel beams (IPN, HEA, UPN) and creates floor openings in Valbonne, Nice, Cannes, Antibes, Saint-Laurent-du-Var, Cagnes-sur-Mer and throughout the Alpes-Maritimes. Do you have a project? Request your quote.